Our Role
We were awarded the Conrad Veil project thanks to our reputation for doing extreme work. The word “extreme” describes pretty much every aspect of our role. The sculpture involved an upper veil and a lower veil, connected by more than 1,600 individual ropes. The upper level is box beam construction and the lower level comprises a series of irregularly shaped “rings.”
From a logistical perspective, the first challenge was that the upper and lower levels were overseen by different companies, and we had to bid on each half separately. We were fortunate to win both contracts – dividing the work among two organizations would have made this job even more complex.
Led by Feature Walters, our most important role in creating this structure was in the planning and foresight to preemptively anticipate challenges. We then oversaw manufacturing and installation of the Veil.