Our Role
Walters Group’s role was to supply, detail, fabricate and erect all of the structural steel required for construction of the façade and the stairs.
Facts & Figures
- King Eddy Building – 90 tons
- Main Building – 1200 tons
- The Main building has a bridge that spans over 4th Avenue SE Street. This bridge connects the East and West buildings.